POL-AQUA builds for PKP Polish State Railways

On the 30th August 2012 a significant agreement was signed between the consortium of P.R.I. “POL-AQUA” S.A. (leader), Dragados S.A. (partner), Vias y Construcciones S.A. (partner), Electren S.A. (partner) and PKP Polskie Linie Kolejowe S.A. of Warsaw.The object of the contract is the “Design and execution of construction works for LCS Łuków - Siedlce, Łuków and Międzyrzec Podlaski stations (full extent of works), as well as sections of the mainline (only signalling systems and telecommunications) under the OPIE project 'Modernisation of the E 20/CE 20 railway line in the Siedlce–Terespol section, stage II'”.

The value of the contract amounts to: PLN 427,390,878.05 net (PLN 525,690,780 gross). The participation of P.R.I. “POL-AQUA” S.A. in the consortium is 31% (Dragados S.A. – 20%, Vias y Construcciones S.A. – 42%, Electren – 7%).

As part of the modernisation plan a full scope of works for LCS Łuków is planned on the following stations: Siedlce, Łuków and Międzyrzec Podlaski and the modernisation of the railway control systems and telecommunication systems on sections of route with a length of over 78 km in the scope of: — track structure, substructure and drainage, — liquidation of the redundant railway infrastructure, — connecting the upgraded railway infrastructure with the infrastructure not subject to liquidation, — platforms, passages under the tracks and footbridges, — engineering objects, — crossings at the level of the tracks and building the bypass roads and bridges, — traction and support structures, — rail traffic control system with a Local Control Center at the Łuków station, — telecommunications network, — DSAT and UOZ systems and noise reduction equipment, — buildings, — non-traction power supply system. The above mentioned contract is the first contract in the railway sector.
POLAQUA Mostostal Wyroby betonowe TECO