Fuel Division

Tytuł

PERN „Przyjaźń” S.A.

ST-1 Adamowo – BS Plebanka pipeline.

Construction of a portion of the DN- 800 PN 6.3 MPa pipeline (3rd line of the ”Przyjaźń” pipeline), along with cathodic protection and a fiber optic line, as well as disassembly of the 1st line of the DN 600 pipeline in the gmina of Repki, poviat of Sokołów Podlaski, Mazowsze voivodeship.

References by PERN „Przyjaźń” S.A. (25 kB)

PERN „Przyjaźń” S.A.

ST-1 Adamowo – BS Plebanka pipeline.

Devising the 9.01 MPa pressure strength test procedures at the pipeline’s highest point, and developing the 7.25 Mpa pressure leakage test procedures at the highest point of the DN 800, PN 6.3 MPa pipeline, conducting the strength and leakage tests of three sections of the DN 800 pipeline with the combined length of 63.432 km, making guaranteed connections – connecting three test sections and developing subcontractor documentation.

References by PERN „Przyjaźń” S.A. (15 kB)

PBRiOT MEGAGAZ S.A.

Bukowo, Sokołów, Liw pipeline

Acting as the general contractor for construction of the DN 800 PN 6.3 MPa pipeline (3rd line of the “Przyjaźń” pipeline), along with cathodic protection, on the territory of Bukowo, Sokołów and Liw gminas. Total length – 32.1 km.

References by PBRiOT MEGAGAZ S.A. (24 kB)

PBG S.A.

Załuski, Naruszewo, Bodzanów pipeline

Acting as the general contractor for construction of the DN 800 PN 6.3 MPa pipeline (3rd line of the “Przyjaźń” pipeline), along with cathodic protection, on the territory of Załuski, Naruszewo and Bodzanów gminas.

References by PBG S.A. (35 kB)

PBRiOT MEGAGAZ S.A.

Natural gas pumping station in Ciechanów.

Water and sewer construction work, with particular emphasis on installation, engineering, construction, process-related and electrical work.

References by PBRiOT MEGAGAZ S.A. (15 kB)

System Gazociągów Tranzytowych EuRoPol GAZ S.A.

Natural Gas Pumping Station in Ciechanów.

Project consisting in building structures and engineering facilities for the Natural Gas Pumping Station in Ciechanów, constituting part of the Yamal – Western Europe Gas Transfer Pipeline on the territory of the Republic of Poland.

References by System Gazociągów Tranzytowych EuRoPol GAZ S.A. (15 kB)

Cetus Energetyka Gazowa

High pressure DN 500 gas pipeline between Szopienice – Oświęcim in Sosnowiec.

Acting a subcontractor for the following project: “Emergency reconstruction of the high pressure DN 500 gas pipeline between Szopienice – Oświęcim in Sosnowiec. In the vicinity of Wojska Polskiego street. The scope of work covered the following: land surveying, ground work (excavation, stock-taking), installation and welding work, non-destructive weld tests, insulation of collections, a 46m drill, cathodic protection, strength and leakage tests, connecting to the gas pipeline in use, participating in commissioning and filling with gas.

References by Cetus Energetyka Gazowa (25 kB)

OLPP w Emilianowie

Construction of four fuel storage tanks with the capacity of 10,000 m3 each, along with the accompanying infrastructure at the Fuel Depot No. 5 in Emilianów.

The scope of work covered the following: preparing the construction design, rolling and shaping sheet metal for tank casings and constructing four double-casing tanks with the capacity of 10,000 m3, installation of AKPiA equipment, installation of the remaining systems (for measuring quantity and density of the stored medium, lighting, electrical, monitoring), leakage tests, technical approval by the Technical Supervision Office, process start-up, installation and welding of process-related systems, constructing a tight and oil-resistant waste water collection system, building a fire road, final commissioning.

References by OLPP in Emilianów (18 kB)
 

ORLEN GAZ Sp. z o.o.

Expansion of the Liquid Gas Distribution Station

Expansion of the existing Liquid Gas Distribution Station located at Długa street in Płock. Two tanks with the capacity of 197m3 were disassembled and modernized under the project. The scope of work covered the following: “special” transportation of the tanks, ground work (7,150.00m3 – removing tank embankments, building ground foundations, creating new embankments), installation and welding work, strength and leakage tests, process launch, participating in commissioning and filling with gas.

References by ORLEN GAZ Sp. z o.o. (26 kB)

PGNiG S.A.

Storage Depot at the Wierzbno Distribution Terminal

The task consisted in constructing floating roof crude oil storage tanks with the capacity of V – 15,000 m3 and V 5,000 m3, constructing a pumping station to OC Lubiatów, constructing a water and foam separation facility, commissioning the system and obtaining the relevant permits.

References by PGNiG S.A. (18 kB)

PGNiG S.A

Mysłowice – Brzezinka gas pipeline

Construction of a DN 500 CN 4,0 MPa, DN 200 CN 2,5 MPa and DN 100 CN 2,5 MPa gas pipeline between Mysłowice and Brzezinka, along with installation of compensators, as well as dam and bleed systems.

References by PGNiG S.A (21 kB)

 
POLAQUA Mostostal Wyroby betonowe TECO