General Purpose Division

Tytuł

ALSTOM POWER Sp. z o.o.

Iron Foundry on the premises of the Elbląg Metallurgy Plant

The task consisted in performing all construction work related to the iron foundry C-43 and a storage umbrella roof CPL-9. The contract covered demolition work, ground work, erecting the facility in the raw, under roof state, constructing foundations for machinery and equipment, preparing indoor systems: ventilation and air conditioning, central heating, hot water, water and sewage, electrical, as well as carrying out the finishing work.

References by ALSTOM POWER Sp. z o.o. (30 kB)

AUCHAN Polska Sp. z o.o.

Auchan Polska Sp. z o.o. Shopping Center

Acting as the general contractor for the construction of the Auchan Shopping Center in Szczecin, i.e. performing all construction and investment-related work and preparing execution designs. The total area under roof is 24,418 m2, building volume 207,169m3, area of internal roads and parking lots 65,000m2.

References by AUCHAN Polska Sp. z o.o. (8 kB)

POLNORD S.A.

General contractor for the construction of buildings and housing estates in Gdańsk and Gdynia

Acting as the general contractor for the following projects: Zielony Stok Estate, detached house at Kartuska street, Pomarańczowe Housing Estate, Wilanowska Estate in Gdańsk and buildings at Bławatna and Grabowo streets, Wiklinowa Estate, apartment block at Kaczewska street in Gdynia.

References by POLNORD S.A. (14 kB)

TESCO Polska Sp. z o.o.

TESCO Gdańsk Shopping Mall

Acting as the general contractor for the Tesco Gdańsk Shopping Mall at 30 Cienista street.

References by TESCO Polska Sp. z o.o. (24 kB)

WILANÓW INVESTMENTS Sp. z o.o.

Construction of the „Nowy Wilanów” Estate in Warsaw – Stage II and III

Constructing and commissioning residential buildings with the total area of 8,700 m2 and 8,500 m2 - 193 apartments, 1,500 m2 of commercial area and 354 parking spots. During the implementation phase the company coordinated the work of a number of specialist subcontractors dealing with electrical, sanitary, low-voltage systems, as well as performing stone, road and facade finishing work.

References by WILANÓW INVESTMENTS Sp. z o.o. (6 kB)

WILANÓW INVESTMENTS Sp. z o.o.

Nowy Wilanów District in Warsaw

Constructing and commissioning five residential buildings with the total area of 52,000 m2, along with infrastructure. During the implementation phase the company coordinated the work of a number of specialist subcontractors dealing with electrical, sanitary, low-voltage systems, as well as performing stone, road and facade finishing work.

References by WILANÓW INVESTMENTS Sp. z o.o. (6 kB)

TK Operations Polska S.A

Galeria Biała Shopping Center in Białystok

The P.R.I. „POL-AQUA” S.A. General Contractorship Branch acted as the general contractor for constructing the Galeria Biąła Shopping Center in Białystok at Czesława Miłosza 2 street. Area under roof 44,400 m2, total area 80,920m2 (net area 77,730.2).

References by TK Operations Polska S.A (15 kB)

Kraków Bussines Park – KBP 400

KBP 400 Office Building in Zabierzów near Cracow

Acting as the general contractor for the project “KBP 400 Office Building in Zabierzów at Krakowska 280 street, along with arrangement of the premises.” Area under roof 2,605 m2, usable area 14,703 m2, building volume 58,989m3.

References by Kraków Bussines Park – KBP 400 (9 kB)

Kraków Bussines Park – KBP 200

KBP 200 Office building in Zabierzów near Cracow

Acting as the general contractor for the project “KBP 200 Office Building in Zabierzów at Krakowska 280 street, along with arrangement of the premises. Adapting the interior for UPM” Area under roof: 2,605 m2, usable area 16,335 m2, building capacity 58,989m3.

References by Kraków Bussines Park – KBP 200 (9 kB)

Urząd Miasta Opola

Teatr Lalki i Aktora im. Smolki (Smołka Puppet and Actor Theater in Opole)

Acting as the general contractor for the public tender order entitled: “Construction of a technical backup building with a rehearsal room for the Teatr Lalki i Aktora im. A. Smolki, along with demolition of the existing technical backup building at Kośnego 2a street”. Total area: 2 384m2, building capacity 6,894 m3, usable area 1,474m2.

References by Opole Town Hall (29 kB)

 
POLAQUA Mostostal Wyroby betonowe TECO